INTEGRE

The fourth steering committee was held in Papeete, on 29 May 2015.

The 4 Pacific overseas territories were represented and the meeting was headed by French Polynesia.

An assessment of the year 2014-2015 allowed all participants to have an overall view of this regional project, from each site's main progress to the implmentation of regional activities.

The validated workplan for 2015-2016 includes:

Regional level:

  • regional workshop on organic farming: New caledonia, first week of november
  • next INTEGRE technical workshop: on waste management, Wallis & Futuna, March 2016
  • bilateral exchanges: follow-up for the 7 validated projects, launch of the econd call for proposals (september 2015 - january 2016)
    • first "mini" methodologicla workshops - Nouméa - september 2015

On sites:

  • New-Caledonia:
    • Forum of management committees (Ouvéa, 2-5 July 2015)
    • Layouts in Ouvéa and the Great South
    • Launching the methodological support in New-Caledonia
  • Wallis & Futuna:
    • Exportation of used oils and batteries
    • reinforcement of the waste-sorting process in Wallis
    • Raising awareness with the College
    • Inventory in preparation for Futuna water management scheme
    • Starting the reforestation of Futuna water catchment areas
  • French Polynesia:
    • Opunohu: participatory diagnostic of the site
    • Raiatea-Tahaa: settlement of a collective professional waste management scheme
    • Tahiti Peninsula: low-cost juvenile production techniques (mesocosm)
  • Pitcairn:
    • Arrival of the French polynesian workers (June 2015)
    • Waste characterization survey (June-November 2015), integrated waste management policy proposal (December 2015)
    • Experts visit (February 2016)

 

 

 

 

2014 © CPS - Réalisation Skazy : sites internet en Nouvelle-Calédonie